Mercedes-Benz EQS 580: energy use, battery size and what it costs to charge
EPA figures for 2024, 2025, 2026 Mercedes-Benz EQS 580 (5 configurations), plus the cost to charge at home in every U.S. state at May 2026 electricity prices.
35.11 kWh/100mi · 106th of 223
The Mercedes-Benz EQS 580 uses 35.11 kWh per 100 miles. Across the 223 electric cars on sale that figure runs from 23.1 to 66.1, which puts this one around the middle.
How much does it cost to charge a Mercedes-Benz EQS 580?
At the U.S. average residential price of 19.42¢ per kWh, a Mercedes-Benz EQS 580 costs about $6.82 per 100 miles, $21.17 for a full charge, and $818 a year at 12,000 miles. The same car costs $552 a year in Nevada and $2,221 in Hawaii — a 4.0× difference driven entirely by where you plug in.
Mercedes-Benz EQS 580 vs. a petrol car
A typical new gasoline large car returns 29 MPG. At $4.32 a gallon — the U.S. average for the week of 2026-09-14, up 14.3% on the year — that is $14.89 per 100 miles against $6.82 for the Mercedes-Benz EQS 580 on average-priced electricity. Over 12,000 miles the fuel difference is $969 a year in favour of the electric car.
- Nevada $552
- Texas $672
- California $1,464
- Hawaii $2,221
Cost to charge a Mercedes-Benz EQS 580 in every state
| State | ¢/kWh | vs. last year | Per 100 mi | Full charge | Per year |
|---|---|---|---|---|---|
| Nevada | 13.11 | +6.9% | $4.60 | $14.29 | $552 |
| Nebraska | 13.25 | +0.8% | $4.65 | $14.44 | $558 |
| Utah | 13.37 | +2.1% | $4.69 | $14.57 | $563 |
| Louisiana | 13.49 | +5.9% | $4.74 | $14.70 | $568 |
| Tennessee | 14.07 | +1.8% | $4.94 | $15.34 | $593 |
| Arkansas | 14.12 | +5.6% | $4.96 | $15.39 | $595 |
| North Dakota | 14.12 | +3% | $4.96 | $15.39 | $595 |
| Kentucky | 14.26 | +6.4% | $5.01 | $15.54 | $601 |
| Oklahoma | 14.33 | +5.1% | $5.03 | $15.62 | $604 |
| Idaho | 14.37 | +19.1% | $5.05 | $15.66 | $605 |
| North Carolina | 14.74 | +10.2% | $5.18 | $16.07 | $621 |
| Mississippi | 14.88 | +5.8% | $5.22 | $16.22 | $627 |
The other 39 states
| State | ¢/kWh | vs. last year | Per 100 mi | Full charge | Per year |
|---|---|---|---|---|---|
| Washington | 14.91 | +15% | $5.23 | $16.25 | $628 |
| New Mexico | 15.06 | +2.6% | $5.29 | $16.42 | $635 |
| Florida | 15.10 | -1.6% | $5.30 | $16.46 | $636 |
| Montana | 15.14 | +2.2% | $5.32 | $16.50 | $638 |
| Arizona | 15.18 | -0.3% | $5.33 | $16.55 | $640 |
| Wyoming | 15.24 | +2.4% | $5.35 | $16.61 | $642 |
| South Dakota | 15.36 | +8% | $5.39 | $16.74 | $647 |
| West Virginia | 15.45 | -2.3% | $5.42 | $16.84 | $651 |
| South Carolina | 15.55 | +5.1% | $5.46 | $16.95 | $655 |
| Kansas | 15.71 | +4.5% | $5.52 | $17.12 | $662 |
| Iowa | 15.93 | +3.9% | $5.59 | $17.36 | $671 |
| Texas | 15.94 | +4.5% | $5.60 | $17.37 | $672 |
| Missouri | 16.22 | +1.9% | $5.69 | $17.68 | $683 |
| Oregon | 16.32 | +3.3% | $5.73 | $17.79 | $688 |
| Georgia | 16.36 | +2.5% | $5.74 | $17.83 | $689 |
| Alabama | 16.40 | +2.1% | $5.76 | $17.88 | $691 |
| Colorado | 17.13 | +6.8% | $6.01 | $18.67 | $722 |
| Virginia | 17.22 | +13.1% | $6.05 | $18.77 | $726 |
| Indiana | 17.51 | +6.2% | $6.15 | $19.09 | $738 |
| Minnesota | 17.52 | +2.3% | $6.15 | $19.10 | $738 |
| Ohio | 19.19 | +9.7% | $6.74 | $20.92 | $809 |
| Delaware | 19.29 | +6.2% | $6.77 | $21.03 | $813 |
| Wisconsin | 19.56 | +5.6% | $6.87 | $21.32 | $824 |
| Illinois | 19.89 | +8.7% | $6.98 | $21.68 | $838 |
| Pennsylvania | 21.73 | +10.4% | $7.63 | $23.69 | $916 |
| Maryland | 21.84 | +13.2% | $7.67 | $23.81 | $920 |
| Michigan | 22.99 | +10.4% | $8.07 | $25.06 | $969 |
| Connecticut | 24.32 | -10.6% | $8.54 | $26.51 | $1,025 |
| District of Columbia | 24.39 | +7.4% | $8.56 | $26.59 | $1,028 |
| Vermont | 24.44 | +6.3% | $8.58 | $26.64 | $1,030 |
| New Jersey | 24.95 | +0.3% | $8.76 | $27.20 | $1,051 |
| New Hampshire | 27.01 | +14.9% | $9.48 | $29.44 | $1,138 |
| Alaska | 28.21 | +5% | $9.90 | $30.75 | $1,189 |
| Rhode Island | 29.23 | +8.9% | $10.26 | $31.86 | $1,232 |
| New York | 29.49 | +11.1% | $10.35 | $32.14 | $1,242 |
| Maine | 29.59 | +5.2% | $10.39 | $32.25 | $1,247 |
| Massachusetts | 29.61 | -2.4% | $10.40 | $32.27 | $1,248 |
| California | 34.74 | +3.4% | $12.20 | $37.87 | $1,464 |
| Hawaii | 52.72 | +28.7% | $18.51 | $57.46 | $2,221 |
Every Mercedes-Benz EQS 580 configuration compared
| Year / configuration | kWh/100mi | mi/kWh | Battery (est.) | Range | MPGe | 240V |
|---|---|---|---|---|---|---|
| 2024 EQS 580 4matic | 35.11 | 2.85 | 109 kWh | 345 mi | 96 | 11.5 h |
| 2024 EQS 580 4matic (SUV) | 40.61 | 2.46 | 120.6 kWh | 330 mi | 83 | 14 h |
| 2025 EQS 580 4matic | 36.24 | 2.76 | 121 kWh | 371 mi | 93 | 11.5 h |
| 2025 EQS 580 4matic (SUV) | 42.13 | 2.37 | 120.2 kWh | 317 mi | 80 | 14 h |
| 2026 EQS 580 4matic | 36.24 | 2.76 | 121 kWh | 371 mi | 93 | 11.5 h |
Questions people ask about the Mercedes-Benz EQS 580
How many kWh per 100 miles does a Mercedes-Benz EQS 580 use?
The Mercedes-Benz EQS 580 uses 35.11 kWh per 100 miles on the EPA combined cycle, which works out to 2.85 miles per kWh. Across all 5 EPA-rated configurations it ranges from 35.11 to 42.13 kWh per 100 miles.
How big is the Mercedes-Benz EQS 580 battery?
Its usable battery capacity works out to roughly 109 kWh. EPA does not publish battery size directly, so this is calculated from EPA range (345 miles) and rated energy use, corrected for charging losses — expect a few kWh of error against the manufacturer figure.
How much does it cost to charge a Mercedes-Benz EQS 580 at home?
About $21.17 for a full charge at the U.S. average residential electricity price of 19.42¢ per kWh, or $6.82 per 100 miles. Over a year at 12,000 miles that is $818. In Nevada the same driving costs $552; in Hawaii it costs $2,221.
How long does a Mercedes-Benz EQS 580 take to charge on a 240V charger?
EPA rates it at about 11.5 hours for a full charge on a 240-volt (Level 2) charger. A standard 120-volt household outlet takes roughly five to six times longer; DC fast charging is far quicker but costs considerably more per kWh than charging at home.
Is a Mercedes-Benz EQS 580 cheaper to run than a gasoline car?
On fuel alone, yes. A Mercedes-Benz EQS 580 costs about $6.82 per 100 miles in electricity. A typical new gasoline large car manages 29 MPG, which at $4.32 a gallon costs $14.89 per 100 miles — $8.07 more. Over 12,000 miles the difference is $969 a year in the EV's favour. This compares fuel only — not insurance, depreciation, maintenance or your state's EV registration fee.
Cars to compare it with
Almost identical energy use
These use within a fraction of a kWh per 100 miles of the Mercedes-Benz EQS 580, so running cost is effectively a wash between them — the decision comes down to everything else.
| Electric car | kWh/100mi | Range | Battery (est.) | Per year |
|---|---|---|---|---|
| Audi Q6 e-tron SB | 35.11 | 301 mi | 95.1 kWh | $818 |
| Genesis Electrified GV70 | 35.11 | 263 mi | 83.1 kWh | $818 |
| Mercedes-Benz EQE 350 | 35.11 | 298 mi | 94.2 kWh | $818 |
| Mercedes-Benz EQE 500 | 35.11 | 298 mi | 94.2 kWh | $818 |
| BMW iX xDrive60 | 34.75 | 364 mi | 113.8 kWh | $810 |
| Genesis Electrified G80 | 34.75 | 282 mi | 88.2 kWh | $810 |
Other electric large cars
- Dodge Charger Daytona R/T — 34.39 kWh/100mi
- BMW i7 xDrive50 — 36.64 kWh/100mi
- BMW i7 xDrive60 — 36.64 kWh/100mi
- BMW i7 eDrive50 — 37.45 kWh/100mi
- Audi S6 e-tron — 32.72 kWh/100mi
- Lucid Air Sapphire — 32.1 kWh/100mi
- Dodge Charger Daytona — 38.3 kWh/100mi
- Tesla Model S Plaid — 30.64 kWh/100mi
- Audi A6 e-tron — 30.36 kWh/100mi
- BMW i7 M70 — 41.61 kWh/100mi
Other Mercedes-Benz electric cars
- AMG EQE — 45.55 kWh/100mi
- AMG EQS — 41.1 kWh/100mi
- CLA250 with EQ Tech — 26.75 kWh/100mi
- CLA350 with EQ Tech — 28.56 kWh/100mi
- EQB 250 — 31.5 kWh/100mi
- EQB 300 — 38.74 kWh/100mi
- EQB 350 — 38.74 kWh/100mi
- EQE 320 — 35.86 kWh/100mi
- EQE 350 — 35.11 kWh/100mi
- EQE 500 — 35.11 kWh/100mi
Where these numbers come from
Energy use per 100 miles is 3,370.5 ÷ MPGe, because EPA
defines MPGe against 33.705 kWh per gasoline gallon equivalent. EPA meters
that energy at the wall, so charging losses are already included.
Usable battery size is EPA range × kWh per 100 miles ÷ 100 ×
0.90. The 0.90 corrects for the fact that EPA measures energy at the wall but
measures range from the pack; without it the estimate runs about 10% high.
It is an estimate, not a manufacturer specification — expect a few kWh of
error either way.
Cost assumes home charging at the state's average
residential electricity price (EIA, May 2026) and
12,000 miles a year. Public DC fast
charging costs considerably more; time-of-use plans can cost less.
The petrol comparison uses the median combined MPG of
current regular-gasoline, non-hybrid cars in this car's own EPA vehicle class
— not an all-car average — priced at the U.S. average retail price from the
EIA weekly series. It counts fuel only.